With over 30 years of experience designing, operating, constructing and maintaining commercial institutional and industrial projects, Hugh is accustomed to meeting large-scale challenges with innovative solutions. He has overseen the design and installation of some of EastPoint’s most complex HVAC, boiler, piping, and life safety systems for buildings, heating plants, and institutional/industrial facilities. In addition to his work directly with clients, he has authored a number of industrial studies, feasibility analyses, and pre-design studies evaluating alternative systems and energy efficiency.
He has managed fuel, electricity, water, and steam utilities for the major manufacturing complex at DSTN Trenton, including an energy audit and upgrade, an energy usage optimization plan, and redeployment from traditional to wind tower and turbine blade manufacturing.